Kavalkade Long Lead Rope
Kavalkade Long Lead Rope has extra length that makes it a great choice for groundwork. The braided polyester rope is fitted with durable hardware and features contrast leather ends.
- Kavalkade 351 10
- 100% Polyester
- Size: 4 Meters (13 Feet)
- Black/Brown, Navy/Cognac, Green/Brown
Kavalkade Long Lead Rope measures 13 feet long and is useful for training, tying, and safer leading. The extra length or rope allows the handler to maintain greater distance from the horse if needed. If a horse startles, it's easier to keep both hands on the rope. There's also less chance of losing your grip altogether. The Kavalkade Long Lead Rope comes in 3 colors. The Black and Navy colors have silver tone hardware; the Khaki Green color has brass tone hardware.
 
         
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
             
             
             
            